Our House Building Adventure

We bought 3 acres of raw land in Wyoming... started clearing it... dug the basement... poured cement... and started framing!

This blog details our house building adventure... building our new home... ourselves!

Friday, September 30, 2005

Floor joists for 2nd floor all done!

Rich finished putting up the floor joists for the 2nd floor today and is beginning to put the subfloor down.

Here's some new pictures:


Floor joists are up for the 2nd floor.


1st floor all framed in! No floor joists.


Floor joists all up!!! Rich is hauling the subfloor around.


Before floor joists.

I arrived at the house to see Rich on the 2nd floor! He was moving the subfloor around.

Monday, September 26, 2005

Some pictures...

The back of the house, facing West.
The front of the house, blinded by sunlight!
The front door.
This is the daylight basement entrance. Above that is the Breakfast room. A beautiful window looks out to the west. It is going to be the center piece of the back of the house with a large eclipse(half circle) window with 6x5 window beneath. It's going to be a breathtaking view of the country side and sunsets!

Who's building this house?

A gentleman came by this afternoon looking for a local builder. He asked, "Who's building this house?"

Now... at the time, Rich was on a ladder and I was on the scaffolding measuring for the floor joists...

Rich replied... I'm building this house. Rich and I were just chuckling over this all afternoon.

The builder that he was looking for is building a house several blocks away from us.

Anyway, so we've got the measuring all done for the floor joists which will support the 2nd floor. Rich is cutting the joists... NOW!

We hope to be all done putting the joists this week.

Sorry I don't have more pictures... forgot to take my camera with me today. I promise more pictures soon!

Thursday, September 22, 2005

All the 1st floor walls are up!!

Just back from helping Rich put up the remaining wall in the breakfast room. Watch for pictures. Tomorrow I'll take some.

The breakfast room has a massive window with a domed top overlooking the west. It's going to be just beautiful!

A couple more cap plates then we're on to floor joists!

Tuesday, September 20, 2005

Almost done with 1st floor walls...



Rich is almost done framing the first floor... Today we pushed up the closet wall in my office. Every day at lunch we push up a couple more walls. Cap plates are also going up as he goes along.

Soon the floor joists will go up for the 2nd floor.

Oh.. I have wonderful news!!! My parents have decided to join us in Wyoming and will be putting up a house on our land just south of us!!!

Power Poles go up!



We're building on the outskirts of the town... but still within town limits for city water/sewer. But in order to get electricity... 3 poles and a transformer have to be installed.

So far 2 poles have been installed...

The gas company has been notified and soon the gas line will be dug.

Tuesday, September 13, 2005

Rained out...



Well, we were planning on raising the south wall on Saturday... but we got rained out. Then we thought that we'd get it raised up on Monday... and it rained and the wind blew....

Today was a beautiful sunny day... but the wall still isn't raised... BUT... the interior 1st floor walls are taking shape.

Soon the South wall will be raised... then lots of interior walls... then the sheathing will hold it all firmly in place.

Friday, September 09, 2005

1st Floor wall raising

It took quite a while to get the floor joists and subfloor done for the 1st floor.

I'm surprised how fast the framing goes! Last evening with a crew of 10... we pushed up the long West and East walls. That was so exciting! It now looks like a house!!!

Today, Rich and I chalked out the floor plan. And now he's onto building the North and South walls. Hope to have them done by Saturday evening so that we can tie the walls together for better strength against any strong Wyoming winds.

Here's some pictures.









The above picture shows the back of the house with the day light basement which faces the West. The part the juts out will be our breakfast room on the 1st floor.

Saturday, July 30, 2005

The Framing in the Basement is done!

Big news! We're be placing the floor joists this coming week. On to the 1st floor!!!!

Friday, July 29, 2005

Basement walls


The daylight part of the basement is all framed in! And most of the basement interior walls are done... I think just a few small walls left!

The floor joists for the 1st floor will be delivered today. That's the next step.

Wednesday, July 13, 2005

Framing has begun!

Yes... this is a momentus event! Our first framed in wall in the basement!

Now... what did I do with my camera? Hmmm... OK... pictures forthcoming!

Wednesday, July 06, 2005

Sewer and water connected...

Moving forward...
We now have the sewer and city water connected to the house.

Got some lumber that'll be delivered tomorrow. Let the framing begin!

Friday, July 01, 2005

Basement floor all done!

Well, below you'll find lots of pictures from the cement pour of the basement floor.

We rented the pump truck again and some power tools for cement work. But... it was still a lot of work!!! But, by mid-afternoon, it was all done. Thanks for many helping hands and lots of sweat!

The floor came out really nice.

Next step is framing. Today, we're heading to Billings, MT for some fun and to order the beams and specially manufactured wood for the floors and roof at a place called BCI.

Thursday, June 30, 2005


It's all done. Just the curing left!!! And then there was a basement floor!
another picture by Toni

Grandpa and his sons... John in the middle and Richard on the right.
another picture by Toni

This was a lot... a lot... of work. Thanks John!
another picture by Toni


another picture by Toni

Grandma and Nephew Joe.
another picture by Toni


another picture by Toni

In comes the power trowel. When John first started this thing up... it whipped him around. Pretty powerful! What a nice finish to the cement.
another picture by Toni