1st Floor Bathroom Update...
The tiling job was finished mid-January.. but boy did I have a bad reaction to the epoxy grout! 2nd degrees burns actually. It's been over a month since that happened and it's all healed up... thank fully!
The vanity was installed but the soapstone top has not been cut yet due to the cold weather and snow outside! The shower rod, toilet paper holder, towel racks and bathroom door still need to be installed!
Matthew's Bedroom...
I'm continuing on finishing the drywall working on the 2nd coat of mud.
Here are some really good drywall finishing videos...
Master Bedroom/Bathroom...
The master bathroom had the rest of the drywall installed today and is ready for taping! Drywall is now being installed in the master bedroom.
The tiling job was finished mid-January.. but boy did I have a bad reaction to the epoxy grout! 2nd degrees burns actually. It's been over a month since that happened and it's all healed up... thank fully!
The vanity was installed but the soapstone top has not been cut yet due to the cold weather and snow outside! The shower rod, toilet paper holder, towel racks and bathroom door still need to be installed!
Matthew's Bedroom...
I'm continuing on finishing the drywall working on the 2nd coat of mud.
Here are some really good drywall finishing videos...
Master Bedroom/Bathroom...
The master bathroom had the rest of the drywall installed today and is ready for taping! Drywall is now being installed in the master bedroom.